Service

Commercial solar installation

A full rooftop solar system for your business premises. We survey, design, install and hand over, and we deal with the paperwork in between.

Who it suits

Solar pays back fastest for businesses that use electricity during the day. If your building has machinery, refrigeration, lighting or office equipment running in daylight hours, most of what the panels produce gets used on site and comes straight off your bill.

  • Factories and engineering works
  • Warehouses and distribution units
  • Trade counters and workshops
  • Offices, schools and community buildings
  • Farm and agricultural buildings

What you get

  • A roof survey and a clear, fixed quotation
  • A panel layout designed around your roof
  • A structural check on the roof
  • The grid connection application (G99) handled for you
  • Installation by a supervised team
  • Electrical work completed and certified by qualified electricians
  • A handover pack with drawings, certificates and warranties

The six stages

  1. 01

    Survey

    We visit, walk the roof safely and check what it is made of, what condition it is in and where the cables can run.

  2. 02

    Design and structural check

    We lay out the panels around rooflights and walkways. A structural engineer confirms the roof can carry the extra weight.

  3. 03

    Grid application

    Most commercial systems need permission from the local network operator before they connect. This is called a G99 application, and we handle it.

  4. 04

    Safety plan

    We write the risk assessments and method statements, then set up edge protection, safe access and welfare before any work starts.

  5. 05

    Install

    Mounting rails first, then panels, cabling and inverters. Qualified electricians complete and certify the electrical work.

  6. 06

    Test and hand over

    We test the system, switch it on and give you a handover pack with drawings, certificates and warranties.

Common questions

Do we need planning permission?

Usually not. Most commercial rooftop solar in England is allowed without a full planning application. Listed buildings and conservation areas are the main exceptions. We check at survey stage.

What is a G99 application?

It is the form used to ask the local electricity network operator for permission to connect a larger solar system. Each part of the UK has its own operator, and we deal with all of them. Approval can take weeks or months, so we apply early.

Will the roof still be watertight?

Yes. On most modern steel roofs the mounting rails clamp to the roof profile without drilling through the outer sheet. Where fixings do go through, they are sealed to the manufacturer's detail.

What if our roof is old?

We tell you what we find. Some older roofs, especially fibre cement and asbestos cement sheets, cannot take panels as they are. Sometimes the right answer is a new roof covering first.

How much will it cost?

It depends on the size of the system, the roof type and the grid connection. We give you a fixed quotation after the survey, with the expected yearly output so you can work out the payback.

Ready to look at your roof?

Tell us where the building is and roughly how big the roof is. We will come back to you with next steps.

Ask for a survey

Or call Brad on 07437 774899 or Russell on 07944 649120

Quick quoteContact us